Ch 6 · Construction

Assess Your Learning

Questions on this page

Chapter 6: Construction

Assess Your Learning · Kaushal Vikas · Class 9 Skill Education · NCERT 2026-27

NCERT Class 9 Kaushal Vikas Chapter 6 Construction — complete answers to Assess Your Learning: structural elements and their functions, load-bearing vs RCC construction, process chart for a boundary wall, construction site safety, effect of moisture on cement, construction bans in drought, and the importance of the plumb bob.

Question 1NCERT PDF page 22
1. Look around your school or neighbourhood and identify any one structure. Identify the basic structural elements (foundation, walls, roof, beams or columns) and describe their functions.
Answer

Structure: our school building

  • Foundation: the lowest part, below the ground; spreads the load of the building evenly onto the soil and keeps it stable.
  • Columns: vertical members (RCC pillars) that carry loads from beams and slabs down to the foundation.
  • Beams: horizontal members that support the slab/roof and transfer its load to the columns.
  • Walls: divide spaces, give privacy, protect from weather and noise; in load-bearing buildings they also carry the roof load.
  • Roof/slab: covers the building and protects from sun and rain; floor slabs carry people and furniture.
  • Plinth, lintels, staircase, doors and windows — plinth protects from dampness; lintels support walls above openings.
Question 2NCERT PDF page 22
2. What kind of construction has been used for your house or school (load-bearing or RCC)? Write the reasons for selecting that type of construction.
Answer

Example: our school uses RCC (reinforced cement concrete) framed construction.

  • It has several storeys — RCC frames (columns, beams, slabs) carry heavy loads safely.
  • It gives large classrooms and halls with fewer internal walls and bigger windows.
  • It is stronger against earthquakes when designed properly.
  • Construction is faster and the building is durable.

(A one- or two-storey house in a village may use load-bearing construction, where thick brick or stone walls carry the roof load — it is cheaper, uses local materials and suits small buildings.)

Question 3NCERT PDF page 22
3. Suppose you are asked to construct a small boundary wall in your school. List the major steps you would include in the process chart and explain why sequencing of steps is important.
Answer
  1. Survey the site and decide length, height and materials; prepare a drawing and estimate.
  2. Collect materials (bricks, cement, sand, water) and tools; arrange safety gear.
  3. Mark the layout with pegs and string (line-out).
  4. Excavate the trench for the foundation.
  5. Lay the foundation (PCC bed) and let it set.
  6. Soak bricks; prepare mortar in the correct ratio (e.g. 1:6).
  7. Lay bricks course by course in English/stretcher bond, checking with plumb bob, spirit level and string.
  8. Provide a coping on top; leave weep holes if needed.
  9. Cure the wall with water for 7–10 days.
  10. Plaster and paint (optional); clean the site.

Why sequence matters: each step depends on the previous one — a wall cannot be built before the foundation sets; skipping curing weakens the mortar; wrong order wastes material and time and can make the wall unsafe. A proper sequence ensures quality, safety and efficiency.

Question 4NCERT PDF page 22
4. Identify three safety rules that must be followed at a construction site. Explain how ignoring any one of them could lead to an accident.
Answer
  1. Always wear personal protective equipment — helmet, safety shoes, gloves, goggles. Ignoring it: a falling brick or tool can cause a serious head injury.
  2. Use safety harnesses and secure scaffolding when working at height. Ignoring it: workers can fall from the scaffold or roof.
  3. Keep the site clean and barricade dangerous areas (trenches, openings, wires). Ignoring it: people may trip over materials, fall into an open trench or get an electric shock.

Other rules: follow the supervisor’s instructions, handle tools carefully, never work under influence, keep first aid ready.

Question 5NCERT PDF page 22
5. Cement was left exposed in a room during the rainy season for many months. What might happen to it and why?
Answer

The cement would absorb moisture from the humid air (cement is hygroscopic) and begin to react with the water (hydration), forming lumps and hardening partly inside the bag. It loses its strength and setting ability, so concrete or mortar made from it would be weak. That is why cement must be stored in a dry place on raised wooden platforms, away from walls, covered with plastic sheets, and used within about three months.

Question 6NCERT PDF page 22
6. Often during summer, especially in a drought year, the Government bans construction activities. Why do you think this is done?
Answer
  • To save water: construction uses huge amounts of water for mixing concrete, curing and dust suppression; during drought, water is needed for drinking and agriculture.
  • To reduce dust and air pollution: dry, hot and windy summers make construction dust spread easily, worsening air quality and health problems (as under GRAP rules in Delhi).
  • To protect workers from extreme heat (heatstroke) during peak hours.
  • To reduce extraction of groundwater, sand and other stressed resources.
Question 7NCERT PDF page 22
7. A student skips the plumb bob while laying bricks, claiming they can ‘see’ if the wall is straight. What is the technical risk of relying on visual estimation? If the wall is even slightly ‘out of plumb’, how might this affect safety over the years?
Answer

Technical risk: the human eye cannot detect small deviations from the vertical — a lean of a few millimetres per course is invisible, but it adds up over many courses. The plumb bob uses gravity to give a true vertical line, so it is far more accurate than estimation.

Long-term effect: an out-of-plumb wall does not transfer its weight straight down to the foundation; the load becomes eccentric, creating bending stresses. Over the years this can cause cracks, bulging, separation from other walls, water seepage, uneven settlement and, in extreme cases or during earthquakes, collapse. It also looks poor and causes problems fixing doors and windows.

Question 8NCERT PDF page 22
8. Of the tasks that you did, which did you enjoy the most? Which did you enjoy the least? Give examples of what went well and what did not. What would you do differently next time?
Answer

Model reflection: I enjoyed laying bricks and checking them with the spirit level and plumb bob most. I enjoyed mixing mortar least because it was tiring.

Went well: our model wall was straight and level; we wore safety gear throughout.

Did not go well: the mortar dried quickly in the heat and some joints were uneven.

Next time: soak bricks before use, mix smaller batches of mortar, keep joints uniform (10 mm) using a string line, and cure properly.

Question 9NCERT PDF page 22
9. Give examples of how you can apply your learnings in a real-life situation.
Answer
  • Check the quality of construction at home — whether curing is done and cement is stored properly.
  • Do small repairs: fill cracks, fix a loose tile, build a small platform for plants.
  • Understand building plans and choose safe, earthquake-resistant construction for a future house.
  • Follow and promote safety rules near construction sites.
  • Save water and reduce dust during home renovation.
  • Explore careers such as mason, site supervisor, civil engineer or architect.